← Back to blog
SAP Migration Phil Garinger · March 31, 2026 · 5 min read

SAP IdM 8.0 End-of-Life: What to Do Now

December 2027 sounds far away — until you realize migration takes 18–36 months. Here is the timeline, the options, and a realistic path that does not require big-bang.

SAP IdM 8.0 mainstream maintenance ends December 2027. Extended maintenance has a hard stop. If you have not started planning, you are already behind a typical enterprise migration timeline.

Realistic timeline

  • Months 1–3: inventory connectors, workflows, and custom ABAP integrations
  • Months 4–12: parallel run with target IGA — do not big-bang SAP HR feeds
  • Months 12–24: cutover by domain — access requests first, then certification, then provisioning
  • Months 24–36: decommission IdM with audit evidence of parity

What to look for in a replacement

Deep SAP connector coverage, workflow parity for complex approval chains, and a path to govern non-SAP identities on the same fabric — including AI agents and non-human identities emerging in your SAP landscape.

EmpowerID has migrated SAP IdM estates for global manufacturers and utilities. Start with a scoped assessment — not a rip-and-replace slide deck.

Get Started

Ready to go deeper?

Request a demo or read Authority in Motion—EmpowerID's product-architecture perspective on agentic identity.

Request Demo See the platform in action
Talk to an Expert Technical consultation
EmpowerID AI

EmpowerID AI Assistant

Online

EmpowerID AI
EmpowerID AI
Hello! How can I help you today?
07:33 PM

Suggested questions:

Powered by EmpowerID AI